Please use this identifier to cite or link to this item: https://idr.l3.nitk.ac.in/jspui/handle/123456789/14723
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShekhar S.
dc.contributor.authorShukla P.
dc.contributor.authorDas B.B.
dc.date.accessioned2021-05-05T10:15:42Z-
dc.date.available2021-05-05T10:15:42Z-
dc.date.issued2021
dc.identifier.citationLecture Notes in Civil Engineering , Vol. 105 , , p. 485 - 496en_US
dc.identifier.urihttps://doi.org/10.1007/978-981-15-8293-6_40
dc.identifier.urihttp://idr.nitk.ac.in/jspui/handle/123456789/14723-
dc.description.abstractProject planning is the most essential part of project management. It plays a vital role in effective completion of a project. A well-developed project plan and schedule are very helpful in managing project costs more efficiently and can preclude time overruns. Mechanical, Electrical and Plumbing (MEP) works being one of the key parts of construction project also require detailed and specific attention in terms of planning. Planning of these works in terms of activity linkage and resource identification is not properly emphasized leading to loop holes in their execution which further is responsible for cost and time overruns. The current study helps in understanding various activities involved in MEP works, how they are related to each other, what are the civil constraints that affect these activities, how their concurrent occurrence can lead to development of complexity which forces one to properly identify and estimate the resources required for their smooth execution. Productivity Rate Method is one of the estimating tools that is used and compared to the actual resource requirement. A template is developed, conceptually based on the activity linkage, which can be directly implemented in a project with similar services. In addition, this template contains the resources required for execution of enlisted activities. Hence, it can be used as a technical tool for efficient planning of MEP works, which further leads to successful accomplishment of project’s goals and objectives. © 2021, Springer Nature Singapore Pte Ltd.en_US
dc.titleDeveloping a Standard Template for Activity Linkage and Resource Estimation of MEP Worksen_US
dc.typeConference Paperen_US
Appears in Collections:2. Conference Papers

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.